Project: Ankara-Eskişehir High Speed Railway
Employer: ALSİM-ALARKO Sanayi Tesisleri ve Ticaret A.Ş.
Location: Eskişehir/ Turkey
Total Length: 2km.
Max. Pier Height: 30m.
Spans: 37.5m
Project Commencement: 2009
About the Project
Foundation, pier and pier-cap construction for the Ankara-Eskişehir highspeed railway viaducts.
Ankara-Eskişehir High Speed Railway
About the Project
Foundation, pier and pier-cap construction for the Ankara-Eskişehir highspeed railway viaducts.
Project Details
Project: Ankara-Eskişehir High Speed Railway
Employer: ALSİM-ALARKO Sanayi Tesisleri ve Ticaret A.Ş.
Location: Eskişehir/ Turkey
Total Length: 2km.
Max. Pier Height: 30m.
Spans: 37.5m